Nordic Visitor Reskin

Summary
Led delivery of a full site reskin under a fixed eight-week deadline, starting from incomplete brand concepts and evolving requirements. Translated brand into a usable system and delivered across a large ecommerce site. This is an AI-generated summary - the full, refined case study is on my CV page.
The Challenge
Incomplete brand inputs, accessibility issues and a tight timeline created risk around both quality and delivery.
Product Rationale
Component-led design
Built a reusable system of ~50–60 components instead of designing pages individually.
Structured stakeholder alignment
Ran focused workshops to align quickly and avoid prolonged feedback loops.
Tech Stack
Key Decisions
Component system over page design: Reduced design overhead and enabled faster rollout across the full site.
Tight delivery control: Protected scope and prioritised only what was needed to hit launch.
On-time delivery: Delivered full reskin within eight weeks, avoiding need for immediate rebuild.
Project Notes
No two projects solve the same problem, so each case study emphasises different aspects of delivery depending on what was most relevant to the challenge. Supporting visuals and implementation details are included here to provide additional context behind the final outcome.
Visuals



